The hotel resort is designed on a plot of 8,620sqm, qualified as tertiary land for commercial and hotel use.
The building ratio permitted is 1.2m3/sqm, so the maximum floor area is 3,694sqm of enclosed surface.
The preliminary project for the hotel complex contemplates the possibility of developing the project in phases, which can run simultaneously or sequentially.
The preliminary project covers the conversion of the existing shopping center.
This project, carried out by our partner, is susceptible to changes in both distribution and incorporation of technological elements, finishes, decoration, etc.
The project developer is a holding company that has been building and developing residential estates on the Costa Blanca since 1963, with a total of around 9,000 homes built in 12 different urbanizations.
A group with a diversified line of business, holding shares in a wide spectrum of businesses: carpenters, garden landscaping, construction, distribution of food products, telecommunications, electrical installations, construction of shopping centres, sports centres,
playgrounds, marinas and schools (Laude The Lady Elizabeth Junior School), and managing their subsequent rental.